real37 Our realizations

ORLEN Projekt S.A.

Completion date: August – October 2014

Construction work under the project of JET Fuel Depot (piping, steel structures, along with anti-corrosion and insulation) at the site of Polski Koncern Naftowy ORLEN S.A. [Polish Oil Company Orlen Joint Stock Company]

real36 Our realizations

ORLEN Projekt S.A.

Completion date: August – October 2014

Construction of two double-skinned  storage tanks for JET fuel of V=2000 m3 capacity; at the site of Fuel Depot of Polski Koncern Naftowy ORLEN S.A. [Polish Oil Company Orlen Joint Stock Company] as a part of the project of newly constructed JET fuel depot.

real35 Our realizations

PAK Serwis Sp. z o.o.

Completion date: August – September 2014

Construction of V = 1000 m3 double-skinned  storage tank of light heating oil at the site of the Pątnów Power Plant

real23 Our realizations

ORLEN Projekt S.A.

Time limit for completion: 01.10.2013 – 30.01.2014

Works in the mechanical and assembly area – installation of pipelines made of stainless steel – node dispensing fuel additives at the TP 111 PKN ORLEN in Wrocław at the active terminal for loading car tankers. The work carried out as an official subcontractor reported in PKN ORLEN

List of other contracts

Lp.

Scope of works and place of work execution

completion date

Ordering Party / name of the plant

1.

Construction of fuel storage tanks of 6000m3-2 items and 5000m3-1 item – Antwerp/Belgium

25.06.2012-30.09.2012

Geldof/LBC

2.

Construction of fuel storage tanks of 3500m3/2500m3-52 items – Willebroek/Belgium

15.05.2012-30.03.2013

Geldof/Vopak

3.

Welding and assembly works connected with construction of a production hall. Assembly of the supporting structure of the roof (roof trusses, bracing,  sheathing)

November 2012- March 2013

Izo-Bet Beata Bielawska Str. Grota Roweckiego 28; 09-410 Płock

4.

Prefabrication of offshore deck module construction – Gudrun in Morska Stocznia Remontowa S.A. [Shiprepair Yard Joint Stock Company] in Świnoujście (MSR) 

December 2011

WNS POMORZE SP. z o.o.

Str. Marynarki Polskiej 96; 80-955 Gdańsk

5.

Prefabrication and assembly of plant steel structures for rinsings transportation –

(prefabrication and assembly of racks, pipelines fasteners with small technological piping, assembly of railings and stairs)

December 2012

F.H.U. „OPAL” Lubno Szlacheckie 66; 38-204 Tarnowiec

6.

Repair of fire water tank of V=480 m3. Replacement of the roof sheathing part and service platform located in Gorlice Oil Plant [Refinery in Gorlice] as NAFTOBUD Sp. z o.o,.

October-November 2010

HEAN Sp. z o.o.

38-300 Gorlice Str. Biecka 23C

7.

Modernization of refrigeration plant – assembly of ammoniating piping with fittings, assembly of steel structures in the area of the Plants of KOŁOBRZESKA GRUPA PRODUCENTÓW RYB Sp. z o.o

Works executed as EURO-BUD Sp. z o.o.

January-October 2011

Zakład Usług Przemysłowych „COLDREX”

8. Assembly of the cooling system for storing chamber, and an evaporative condenser at AMP Logistyka Sp. z o.o Str. Przemysłowa 13; 09-100 Płońsk

June 2012 –February 2013

Zakład Usług Przemysłowych „COLDREX”

9. Replacement of steam heating carbon steel pipe systems in the former Glimar Gorlice Oil Refinery

Scope of works as follows:

– assembly of carbon steel pipe systems – DN25 – DN200

– corrosion protection

– assembly of thermal insulation

5 October – 20 December 2012

HEAN Sp. z o.o.

38-300 Gorlice Str. Biecka 23C

10. Modernization – piping the water turbine power unit within the area of Kozienice Power Plant

Assembly of the piping – DN350- DN500

– Maintenance work with heat exchangers for revision of the Office of Technical Inspection [Urząd Dozoru Technicznego /UDT] ( of distributor shafts and inserts)

– Repair and supervision of the V-401 condenser ] for needs of Office of Technical Inspection [Urząd Dozoru Technicznego /UDT]

07.03.2013-30.08.2013

Przedsiębiorstwo Remontów i modernizacji Chemorozruch Sp. z o.o Str. Lipowa 5; 32-600 Oświęcim

11. Assembly and welding works Assembly of auxiliary task: cleaning the tank of oil in the Resources Base of PERN.

Scope of work: – completion of rinsings tray made of 5mm steel sheet with a capacity of 4m3 of the overflow baffle

– Fastening steel exhaust fans – 2 items – on the mantle and oil tank cover

– and assembly of roof cleaning nets

– Dismantling of the completed installation/systems

1st stage

16.11.2012-22.12.2012

2nd stage

10.02.2013-14.04.2013

EURO-BUD

Str. Klasztorna 11

38-200 Jasło

12. Assembly and welding works when constructing the plant of Mild Hydrocracking (Mild Hydrocracking) in the Rafineria LOTOS S.A. [LOTOS Oil Company] in Gdańsk under the framework of 10+ project (execution as NAFTOBUD Sp. z o.o)

– disassembly and assembly heat exchanger components for cleaning and revision of the UDT

– disassembly and assembly elements for cleaning of air coolers

– Assembly of internal fittings of columns

3rd quarter 2008

WNS POMORZE SP. z o.o.

Str. Marynarki Polskiej 96; 80-955 Gdańsk

13. Dismantling of the supporting structure of the roof with the final carga of the tank shell of V 2000B located within the area of PKN ORLEN S.A. Production Plant – plot 14B – Contract no 26/KP/OE/2013

September 2013

ORLEN EKO Sp. z o.o. 7 Chemików Str., 09-411 Płock

14. Mechanical engineering works related to the modernization of the D5 and D4 torch located at the plant of KT-1/1 in Możejki Refinery

Scope of works:

– replacement of seals molecular

– modernization of gas pipelines,

– steam and condensate

– modernization of equipment

– repair of heat exchangers, columns

– preparation of columns for revision

October-November 2012

CKTiS Spółka Akcyjna

09-411 Płock, Str. Zglenickiego 44C

15. Renovation work during the shutdown SPRING 2013 Refinery LOTOS SA in Gdansk

– Repair of heat exchangers ( for cleaning and assembly of inserts – overhaul of the shelves columns

– execution of the ‘ well’, repair of the damaged shelves of the 1200 and 1400 oil block sections.

– Replacement of 1400 pipes convection oven section.

The work performed as officially reported and accepted by LOTOS SA contractor. Contract No. 1972/2013

10.04-04.05.2013

as official subcontractor to

PETRO EnergoRem Sp. z o.o.

42 Zglenickiego Str.

09-411 Płock

16. Maintenance and supervision works during shutdown  of the Electrolysis Unit – – CTP-1 Plant

Scope of works:

– and assembly of fittings for overhaul

– Dismantling and assembly of pipelines for overhaul and testing

– Dismantling and assembly of heat exchangers for supervision by the Office of Technical Inspection [Urząd Dozoru Technicznego /UDT]

– Repair of the coat of heat exchangers (padding) for the Office of Technical Inspection [Urząd Dozoru Technicznego /UDT]

– Renovation of the column C-101 (review of shelves – repair of damaged items)

– welding for repair, replacement some sections of and minor constructions,

– Execution of tightness tests of piping and equipment (heat exchangers, columns, tanks)

– Blinding and unblinding of pipelines and equipment

16.08-25.08.2013

PCC Rokita S.A.

Str. Sienkiewicza 4

56-120 Brzeg Dolny

17. Implementation of the mechanical part of the project No. 30506 “Replacing operating platforms” at the site of Aromatics Extraction plant of Polski Koncern Naftowy [Polish Oil Company] ORLEN S.A.

Contract no 5600002931/ZIR/JZ/2013

01.07.2013-30.08.2013

Polski Koncern Naftowy ORLEN S.A.

7 Chemików Str.;

09-400 Płock

18. Assembly work under the investment project “Assembly of extraction-condensing turbine set in PGE GiEK Branch Power Plant Zgierz, including in particular:

– Assembly of cooling water pipelines,

– Assembly of fresh steam pipelines (material 13CrMo4 gr. 15-24mm)

– Assembly of the heating part and making the necessary cutouts, alterations and closing caps

– Assembly of the turbine bleed pipelines

– Assembly of pipelines feed water and condensate

– Assembly of pipelines around the degasser

– Assembly of main pipelines condensate and water injection

– Assembly of vacuum pipelines

– Assembly of the pipeline feeding water to the cold store

– Assembly of pipelines outside the oil system

– Assembly of compressed air pipes

– Assembly of steel rake structures

– carrying out necessary tests and trials

01.07.2013- 15.01.2014

as official subcontractor to

Chemorozruch Sp. z o.o.

Str. Lipowa 5

32-600 Oświęcim

19. The mechanical and assembly industry work at EC Zgierz consisting of:

– of elements of heat exchange devices for supervision by the Office of Technical Inspection [Urząd Dozoru Technicznego /UDT] ,

– Installation of the feed water tank.

– Repair of thermal degasser column,

– Assembly of a diesel heater.

October 2013-12.12.2013

Chemorozruch Sp. z o.o.

Str. Lipowa 5

32-600 Oświęcim

20. Assembly work for the investment of „Mounting of the extraction-condensing turbine set in PGE SA GiEK Branch Power Plant Zgierz, including mounting flanges, nozzles and welded and screwed flow meters – including the ones on the pipelines of 13CrMo4 type.

1.09.2013- 15.11.2013

Gaz & Oil Project Management Sp. z o.o.

Str. Kosynierów Gdyńskich 54B

82-300 Elbląg

21. Alignment of the collector for oil WR-1 to discharge the substance heated to a temperature. 80®C.

– Assembly of DN 450 pipelines

– Assembly of mounted steam heating pipes

– Execution of the corrosion protection.

On-going works

To be completed as of 30.01.2014

“SAP SERWIS”

Łukoszyn 9

09-215 Bożewo

22. The work of mechanical and assembly industry at EC Kozienice consisting of:

– renovation of the devices (exchangers, coolers)

– dismantling parts of apparatus for supervision by the Office of Technical Inspection [Urząd Dozoru Technicznego /UDT] and cleaning

– Dismantling and assembly of pipelines for cleaning and revision

– Execution of pressure tests for the Office of Technical Inspection [Urząd Dozoru Technicznego /UDT],

– Installation of steel structures.

November 2013 – December 2014

Chemorozruch Sp. z o.o.

Str. Lipowa 5

32-600 Oświęcim

23. Works in the mechanical and assembly area – installation of pipelines made of stainless steel – node dispensing fuel additives at the TP 111 PKN ORLEN in Wrocław at the active terminal for loading car tankers. The work carried out as an official subcontractor reported in PKN ORLEN 01.10.2013 30.01.2014

Orlen Projekt SA

42 Zglenickiego Str.

09-411 Płock

24. Works related to tie-ins execution for the work under implementation – dosing of the bio component for the SUPER PLUS 98 petrol at the site of TP 111 PKN ORLEN in Wrocław.

Works were executed at the on-operation loading terminal for car tanks

25.01.-26.01.2014

Orlen Projekt SA

42 Zglenickiego Str.

09-411 Płock

25. works related to the modernization of technological furnaces firing systems at the Reforming V and HON V plant

10.04-08.06.2014

Orlen Projekt SA

42 Zglenickiego Str.

09-411 Płock

26. Extension the existing nodes for dispensing fuel additives within the fuel terminal of PKN ORLEN S.A. in Wrocław

February-June 2014

Orlen Projekt SA

42 Zglenickiego Str.

09-411 Płock

27. Maintenance work of the plant of Concentration Node at the Department of Concentration of the Dept. of Liquid Fuels of Polski Koncern Naftowy ORLEN S.A.

28.03-26.04.2014

Chemorozruch Sp. z o.o.

Str. Lipowa 5

32-600 Oświęcim

28. Maintenance work of the plant of Feed Preparation for Alkylation of the Department of Liquid Gases – Polski Koncern Naftowy ORLEN S.A.

28.03-26.04.2014

Chemorozruch Sp. z o.o.

Str. Lipowa 5

32-600 Oświęcim

29. Maintenance work of the plant of Gudron hydrodesulphurisation at the site of Polski Koncern Naftowy ORLEN S.A. [Polish Oil Company Orlen SA]

28.03.2014-09.04.2014

Chemorozruch Sp. z o.o.

Str. Lipowa 5

32-600 Oświęcim

30. Repair of tanks at the plant of Liquid Gases Composition at the site of Polski Koncern Naftowy ORLEN S.A. [Polish Oil Company Orlen SA] Contract 5600003816/ZRU/GS/2014

20.03.2014-01.09.2014

Polski Koncern Naftowy ORLEN S.A.

7 Chemików Str.

09-411 Płock

31. Modernization of the condensate vacuum box pipeline DRW 6 at the site of Polski Koncern Naftowy ORLEN S.A. [Polish Oil Company Orlen SA] Contract no 5600004094/ZRU/JZ/2014

08.05-17.05.2014

Polski Koncern Naftowy ORLEN S.A.

7 Chemików Str.

09-411 Płock

32. Execution of mechanical and assembly works during a standstill of the Hydrogen Plant II at Polski Koncern Naftowy ORLEN S.A. [Polish Oil Company Orlen SA] Contract 5600004145/ZRU/JW./2014

04.06-17.06.2014

Polski Koncern Naftowy ORLEN S.A.

7 Chemików Str.

09-411 Płock

33. Execution of the hydrogen pressure regulation system on net during plant shut down  of the Hydrogen Recovery Plant with submission of excess to the heating gas at the site of Polski Koncern Naftowy ORLEN S.A. [Polish Oil Company Orlen Joint Stock Company] Contract 5600004086/ZRU/JW./2014

07.05-18.07.2014

Polski Koncern Naftowy ORLEN S.A.

7 Chemików Str.

09-411 Płock

34. Construction of an absorber, silos of calcium and slaked /active lime at the site of a waste incineration plant in Konin.

August – September 2014

PAK Serwis Sp. z o.o.

158 Przemysłowa Str

62-510 Konin

35. Construction of V = 1000 m3 double-skinned  storage tank of light heating oil at the site of the Pątnów Power Plant

August – September 2014

PAK Serwis Sp. z o.o.

158 Przemysłowa Str

62-510 Konin

36. Construction of two double-skinned  storage tanks for JET fuel of V=2000 m3 capacity; at the site of Fuel Depot of Polski Koncern Naftowy ORLEN S.A. [Polish Oil Company Orlen Joint Stock Company] as a part of the project of newly constructed JET fuel depot.

August – October 2014

ORLEN Projekt S.A.

42 Zglenickiego Str.

09-411 Płock

37. Construction work under the project of JET Fuel Depot (piping, steel structures, along with anti-corrosion and insulation) at the site of Polski Koncern Naftowy ORLEN S.A. [Polish Oil Company Orlen Joint Stock Company]

August – October 2014

ORLEN Projekt S.A.

42 Zglenickiego Str.

09-411 Płock

38. Maintenance work of the plant of Hydroodsiarczania Gudronu Grupa A3 Polski Koncern Naftowy ORLEN S.A. [Polish Oil Company Orlen SA] Contract 5600004379/ZRU/JW./2014

06.09.2014-30.09.2014

Polski Koncern Naftowy ORLEN S.A.

7 Chemików Str.

09-411 Płock

39. The construction of the water process tank and the tank of centrifuges at the site of EC Gdynia

01.10.2014- 20.11.2014

NAFTO Sp. z o.o.

30 Igołomska Str.

31-983 Kraków

40. Complex assembly of feed water pressure pipelines along with the supporting structures in block no 2 in the Pątnów Power Plant.

The scope of work includes:

– Replacement of feed water discharge pipe

– Pipelines of injection of diesel WP

– Pipelines minimum flow

– Auxiliary feedwater discharge pipe system

Total weight: 51 TONS

12.2014-28.02.2015 – I stage

12.2014-30.06.2015 – II stage

PAK Serwis Sp. z o.o.

158 Przemysłowa Str

62-510 Konin

41. A comprehensive installation of pipelines, together with the suspension and support structures executed within the framework of the modernization of TG1 and TG2 in the Pątnów Power Plant.

The scope of work includes:

– Auxiliary condensate pipelines

– Supplemental and emergency condensate pipelines

– Pipelines discharging fumes from the boiler ZWZ and de-watered press tool expander block

– Pipelines extracting fumes from regenerative WP, NP. and PKG heaters into the condenser

– ZWZ blow-out system

– System of drains and dewatering

Total weight: 80 tons

11.2014-30.04.2015

PAK Serwis Sp. z o.o.

158 Przemysłowa Str

62-510 Konin

42. Maintenance work of the plant in terms of mechanics at the site of DRW 2 plant of Polski Koncern Naftowy ORLEN S.A. [Polish Oil Company Orlen Joint Stock Company]

07.04.2015-28.04.2015

Polski Koncern Naftowy ORLEN S.A.

7 Chemików Str.

09-411 Płock

43. The assembly of DN 400 nitrogen pipelines at the site of Copper Smelter in the Głogów

09.04-07.07.2015

ZEC Service Sp. z o.o.

Str. Łowiecka 24

50-220 Wrocław

44. Reconstruction of automatic Pouring Station ASN5 of the Rail Terminal, Płock Płock at the site of Polski Koncern Naftowy ORLEN S.A. [Polish Oil Company Orlen Joint Stock Company]

15.05-19.06.2015

ORLEN Projekt S.A.

42 Zglenickiego Str.

09-411 Płock

45. Reconstruction of automatic Pouring Station ASN1 of the Rail Terminal, Płock at the site of Polski Koncern Naftowy ORLEN S.A. [Polish Oil Company Orlen Joint Stock Company]

01.06-31.07.2015

ORLEN Projekt S.A.

42 Zglenickiego Str.

09-411 Płock

46. Maintenance work of the plant of Hydroodsiarczania Gudronu at the site of PKN ORLEN S.A. in Płock

On-going works

Polski Koncern Naftowy ORLEN S.A.

7 Chemików Str.

09-411 Płock

47. Maintenance work of the plant of Hydrogen Recovery at the site of PKN ORLEN S.A. in Płock

On-going works

Polski Koncern Naftowy ORLEN S.A.

7 Chemików Str.

09-411 Płock

48. Maintenance work at Clausa plant at the site of PKN ORLEN S.A. in Płock

On-going works

Polski Koncern Naftowy ORLEN S.A.

7 Chemików Str.

09-411 Płock

49. Maintenance work of the plant of Tubular-Tower Distillation IV (DRW IV) at the site of PKN ORLEN S.A. in Płock

On-going works

Polski Koncern Naftowy ORLEN S.A.

7 Chemików Str.

09-411 Płock

List of other contracts – download here.

Are you interested in our Offer?

more

Contact

EURO-RAF Sp. z o.o.
ul. Długa 49
09-400 Płock

biuro@euroraf.pl